[Help](/help/) › [Handbook](/help/handbook/) › [Integrations](/help/handbook/integrations/) › [Deep Sync Integrations](/help/handbook/integrations/deep-sync-integrations/) › Asana Sync Integration

# Asana Sync Integration

Plans: Premium, Unlimited, Enterprise · Permissions: Admins, Employees\*, Managers\* · \*\*Optional Add-ons:\*\* Tasks\*

[How to Sync Timely with Asana](https://play.vidyard.com/cvjLfEB1ZrH6Rgubu7YPoS)

## Overview

This integration offers capabilities beyond the previous Asana integration, which tracked time spent on Asana items. The Asana Sync integration complements that by allowing you to seamlessly manage projects, update tasks in real-time, and maintain full visibility over progress in both tools.

### What the Asana Sync Integration includes

-   **Real-time updates** — projects and tasks stay in sync
-   **Users, projects & tasks synced** — automatically import from Asana
-   **Tags, organized** — Asana tags appear as individual Timely tags
-   **Updated architecture** — OAuth with encrypted data transfer
-   **Time flows back to Asana** — log time in Timely and see it reflected on Asana tasks

## Plan requirements

The Asana Sync integration is part of the **Next-Gen Sync Integrations** feature set, which requires an entitled plan (Premium, Unlimited, or Enterprise). If your workspace is on an unentitled plan, the Next-Gen Sync Integrations section is still visible in **Settings > Integrations**, but the integration cards are read-only and display an upgrade prompt — you cannot set up or reconnect integrations until your plan is upgraded. Admins see a direct upgrade link; non-admin members see a prompt to contact their workspace admin or account manager.

> **Warning:** If you connected Asana on a higher plan and then downgraded, the integration is automatically disconnected. The card remains visible on unentitled plans so you can see its status, but you cannot reconnect until you upgrade. After upgrading again, you must reconnect Asana manually through the normal OAuth flow — the integration does not restore itself automatically.

## Connecting Timely to Asana — Workspace Admin

1.  Head to **Settings > Integrations** in Timely
2.  Choose **Asana** from the **Next-Gen Integrations** section
3.  Click **Connect workspace with Asana**, log in, and click **Allow**

![Connecting Asana workspace](/cdn/help-center/integrations-asana-sync-connect.gif)

4.  Select or confirm the Asana workspace, then click **Next**

![Select Asana workspace](/cdn/help-center/integrations-asana-sync-workspace.gif)

5.  Confirm the sync configuration (defaults are pre-set):
    -   Create Memories from Asana activity
    -   Create Projects from Asana projects
    -   Log time against Asana tasks without task creation
    -   Real-time sync enabled

![Sync configuration](/cdn/help-center/integrations-asana-sync-config.gif)

Additional options include:

-   Create Tags from Asana Tags
-   Sync Team Members
-   Create Tasks from Asana Tasks
-   Sync time entries to Asana

6.  Click **Synchronize with Asana** to finalize

> **Note:** Each individual user still needs to connect their own Asana account to see their activity on their timeline.

## Connecting — Personal Integration (Employees, Managers)

1.  Navigate to **Settings > Integrations**
2.  Find Asana in **Next-Gen Integrations**
3.  Click **“Authenticate with Asana”**
4.  Click **Allow** to approve permissions

## Items synced from Asana

| Asana Item | Appears in Timely as | Details |
| --- | --- | --- |
| Clients | Clients | Imported as active clients |
| Projects | Projects | Archived projects are skipped |
| Tasks | Tasks or Linked Work | Default: Linked Work references |
| Subtasks | Tasks | Up to 5 levels deep, shown flat |
| Tags | Tags | Optional — must be enabled |
| Users | Users or Unassigned Users | Auto-matched by email |
| Task Activity | Memories | Creation, completion, commenting, etc. |
| Logged Time | Syncs back to Asana | Optional, appears as comments |

## Duplicate client names during import

If two or more Asana entities share the same display name (for example, two workspaces both called “Acme”), Timely will import all of them rather than silently dropping the duplicates. Each additional client receives a numeric suffix to make it unique — for example, **Acme (2)**, **Acme (3)**, and so on.

> **Note:** The suffix is applied only to the Timely client name; the original Asana entity is not affected. If the upstream name is later changed in Asana to something that no longer collides, the suffix is automatically removed on the next sync.

## Memories from Asana activity

These actions generate a Memory in Timely:

-   Create or complete tasks
-   Move tasks between projects
-   Reassign or rename tasks
-   Add comments
-   Visit app.asana.com in your browser

## Logging time against Asana tasks

Once connected, search for Asana tasks directly in the time entry form. With the default configuration, tasks appear as **Linked Work** in AutoSheet or **Attach a Task** on the Classic timeline.

![Logging time to Asana tasks](/cdn/help-center/integrations-asana-sync-logging.png)

## Checking time entry sync

When **Sync time entries to Asana** is turned on, the workspace connection’s settings (**Settings > Integrations > Asana**) include a **Time Entry Sync** tab. It shows how many time entries are **Synced**, **In progress**, and **Failed**.

If any entries have failed, click the **Failed** row to expand it. Failures are grouped by reason, with the number of entries for each:

-   **Authentication failed** — the Asana connection needs to be re-authenticated. Workspace admins receive an in-app notification and email when this happens so they can reconnect the integration.
-   **Permission denied** — the connected Asana account can’t update that task or project
-   **Task not found** — the Asana task no longer exists
-   **Rate limited** — Asana received too many requests at once
-   **Validation error** — Asana didn’t accept the entry’s data
-   **Unknown error** — any failure that doesn’t match the reasons above

## Removing the Asana Sync integration

Head to **Settings > Integrations**, select **Asana**, click **Settings**, then **Disconnect**.

If Asana revokes Timely’s access for any reason, the connection is disconnected automatically. Workspace admins receive both an in-app notification and an email so they can reconnect straight away.

> **Note:** Imported objects will remain in Timely after disconnection.

![Removing Asana integration](/cdn/help-center/integrations-asana-sync-remove.gif)

## FAQs

**Do I need the Tasks add-on?**

No — you can log time using Linked Work references without it. The add-on is only needed to import Asana tasks as full Timely Tasks and sync time back.

**Can time logged in Timely show up in Asana?**

Yes! If task creation is enabled with start/end dates, time entries sync back as comments on the original Asana task.

**What if I want to add projects or switch accounts?**

You’ll need to disconnect and reconnect the integration.

**What happens to my Asana connection if my workspace downgrades to a plan without integrations?**

The connection is automatically disconnected. Task syncing stops and you will no longer be able to manage the integration from Settings until your plan is upgraded. After upgrading, reconnect Asana by going to **Settings > Integrations > Asana** and completing the OAuth flow again — the connection does not restore itself automatically.

Last updated November 3, 2026

Have feedback for this article or need more help? [Contact us now.](mailto:support@timely.com)

## Related articles

- [Handbook · Jira Sync Integration · Sync projects, tasks, users, and time entries between Jira and Timely with two-way sync support.](/help/handbook/integrations/jira-sync/)
